⚡ NATIONWIDE — Panel Upgrades Available in All 50 States
HQ: 2809 Cedar St, Everett, WA 98206|(360) 865-4464
Call 24/7 Dispatch(360) 865-4464
Get Quote →
Headquarters
2809 Cedar St
Everett, WA 98206
(360) 865-4464
Home / Services / Panel Upgrades
Most Requested — Nationwide

Panel upgrades 100A to 400A. Done right the first time.

Replace Federal Pacific, Zinsco, Pushmatic, or overloaded panels with modern, code-compliant 200A/400A service. Load calculations, utility coordination, permitting, inspection — all handled from our Everett HQ coordination center, dispatched locally in all 50 states.

Call (360) 865-4464Get Assessment
200A / 400A
Modern Service
2 Week
Avg. Lead Time
50 States
Coverage
Panel Upgrade
Code-Compliant • Permit Included
Load Calcs IncludedNEC 220 calculations for your home
Utility CoordinationPSE, SCE, PG&E, FPL & more
What’s Included

Everything from assessment to inspection sticker.

Full electrical load calculation — NEC Article 220, accounting for HVAC, EV, appliances, future additions. No guessing.
Panel replacement — Siemens, Square D, Eaton, Leviton with copper bus, whole-home surge optional.
Service entrance upgrade — Meter base, riser, grounding electrodes, bonding, weatherhead if needed.
Permit & inspection handling — We pull permits in your jurisdiction (Seattle to Miami-Dade) and meet inspector.
Utility shutdown & reconnect coordination — We schedule with utility, minimize downtime.
Labeling & documentation — Circuit directory typed, photos for your records, warranty emailed.

Signs you need an upgrade

Breakers tripping regularly, panel warm to touch, flickering when AC starts
100A service with EV, hot tub, or addition planned
Federal Pacific / Zinsco / Challenger panel — known safety issues
Insurance requiring upgrade or home sale inspection flagged panel
01

Nationwide Material Sourcing

200A panels are backordered in many markets. Our HQ in Everett maintains national supplier relationships — 2-week avg lead vs 6-8 weeks elsewhere.

02

One Contractor, Any State

Managing properties in WA, TX, FL? One PM from 2809 Cedar St, one invoice, same SOP. No chasing 5 electricians.

How long does a panel upgrade take?

Most homes: 1 day for install, plus utility reconnect (2-6 hrs outage). Permit + scheduling adds 1-2 weeks. Commercial / 400A: 1-2 days.

Do you handle permits in my state?

Yes. From Snohomish County to Broward County — our coordination team knows AHJ requirements and pulls permits under our licensed network.

Cost range?

Residential 100A→200A typically $2,800–$4,800 depending on location, meter location, grounding. We give written flat price after site assessment — no surprises.

Panel Upgrade — Nationwide

Upgrade your panel anywhere in the USA.

✓ Free load calculation & site assessment
✓ Permit + inspection + utility coordination included
✓ HQ: 2809 Cedar St, Everett, WA — dispatch in 50 states

Request Panel Assessment

We respond within 2 hours. Serving all 50 states from Everett, WA.